Skip to main content
Stesso
BrowseMy ProjectsBlog
Log inSign up
Stesso

Step 6 · Re-pressurize and Check for Leaks

Double-check that the tank connection is tight and that the hose-bib drain valve on the tank tee is fully closed. Also ensure any faucets you opened to drain the system are now closed. Go to the main water shut-off valve and open it SLOWLY. You will hear water begin to fill the new tank and the pipes. As the system fills, meticulously inspect the new connection point between the tank and the tee for any signs of water. Use a dry paper towel or your hand to feel for moisture. If you detect a leak, shut the water off and tighten the connection slightly (1/4 turn) and test again.

Stesso
BrowseMy Projects
Sign in

Step 6 · Re-pressurize and Check for Leaks

Double-check that the tank connection is tight and that the hose-bib drain valve on the tank tee is fully closed. Also ensure any faucets you opened to drain the system are now closed. Go to the main water shut-off valve and open it SLOWLY. You will hear water begin to fill the new tank and the pipes. As the system fills, meticulously inspect the new connection point between the tank and the tee for any signs of water. Use a dry paper towel or your hand to feel for moisture. If you detect a leak, shut the water off and tighten the connection slightly (1/4 turn) and test again.

Tools and Materials

← Project

How to Replace a Well Pressure Tank

Step 6 of 7·35 min left

Preparation and Safety
15 mins1 itemsIntermediate
Drain the Old Tank
45 mins3 itemsIntermediate
Disconnect Plumbing
20 mins3 items
Prepare and Pre-charge New Tank
15 mins3 itemsIntermediate
Install the New Tank
25 mins4 itemsAdvanced
6
Re-pressurize and Check for Leaks
15 mins2 itemsIntermediate
7
Restore Power and Test System
20 mins1 itemsAdvanced
Prev
Next