Step 5 · Dry Fit and Install PVC Flange Assembly

First, slide the flexible transition coupling (e.g., a Fernco coupling) over the cleaned cast iron pipe. Next, prepare the PVC components. Cut a short piece of 4" PVC pipe that will connect the flange to the coupling. Apply PVC primer to the inside of the flange hub and the outside of the PVC pipe end, then apply PVC cement to the same surfaces and push them together with a quarter turn. Hold for 30 seconds. Now, insert the PVC pipe into the flexible coupling. Position the flange so it sits flat on the floor, with the closet bolt slots oriented parallel to the back wall. Use a nut driver or socket wrench to tighten the stainless steel bands on the flexible coupling, securing it to both the cast iron and PVC pipes. Do not overtighten, but ensure it is snug. Finally, secure the flange to the subfloor using appropriate screws (e.g., stainless steel or corrosion-resistant screws).

Stesso
BrowseMy Projects
Sign in

Step 5 · Dry Fit and Install PVC Flange Assembly

First, slide the flexible transition coupling (e.g., a Fernco coupling) over the cleaned cast iron pipe. Next, prepare the PVC components. Cut a short piece of 4" PVC pipe that will connect the flange to the coupling. Apply PVC primer to the inside of the flange hub and the outside of the PVC pipe end, then apply PVC cement to the same surfaces and push them together with a quarter turn. Hold for 30 seconds. Now, insert the PVC pipe into the flexible coupling. Position the flange so it sits flat on the floor, with the closet bolt slots oriented parallel to the back wall. Use a nut driver or socket wrench to tighten the stainless steel bands on the flexible coupling, securing it to both the cast iron and PVC pipes. Do not overtighten, but ensure it is snug. Finally, secure the flange to the subfloor using appropriate screws (e.g., stainless steel or corrosion-resistant screws).

Tools and Materials

← Project

How to Replace a Cast Iron Toilet Flange with PVC

Step 5 of 6·1 hr left

Prepare Workspace and Remove Toilet
30 mins6 itemsIntermediate
Break and Remove the Old Cast Iron Flange
1 min6 items
Clean and Prepare Drain Pipe
20 mins5 itemsAdvanced
Cut Drain Pipe to Correct Height
30 mins9 items
5
Dry Fit and Install PVC Flange Assembly
30 mins8 itemsAdvanced
6
Reinstall the Toilet
30 mins5 itemsIntermediate